Malloy Drain Phase 2A
Ossa Terra Ltd successfully bid for part of Phase 2A of the Malloy Drain Stormwater Management Project in Coaldale. The Malloy Drain Stormwater Management Project was set up as a collaboration between the Town of Coaldale, Lethbridge County, Alberta Transportation, Alberta Environment, and St.Mary River Irrigation District (SMRID) to prevent flooding in the Malloy drainage basin. The Phase 2A section of the project which Ossa Terra is working on includes a channel, south storm pond and pipeline components to help with flood prevention.